As built
Site records
Each job photographed after handover, with its material, its town, its year and the time spent on site.

Eight oak windows for a 1930s house
Rotten frames taken out entirely, new windows with glazing bars to keep the original design.
Oak, double glazing3 days on site

Chevron parquet and a new French window
Twenty-four square metres laid in chevron, and the old French window replaced at the same time.
Engineered oak, oiled4 days on site

Wall-to-wall library
Shelves drawn around the books and the heating vent, with lighting built into the uprights.
Walnut veneer and solid oak2 days on site

Full-height bedroom wardrobe
Moulded doors up to the ceiling, hanging space on one side, drawers and shelves on the other.
Lacquered MDF, oak inside1 day on site

Wood-front kitchen
Tall units to the ceiling, a built-in oven and a solid wood post kept as a room divider.
Walnut veneer, black worktop3 days on site

Hinged shutters made to the old pattern
Twelve shutters copied from the originals, with the prior declaration filed before manufacture.
Painted pine2 days on site

Entrance storage wall
Coats, shoes and the vacuum cleaner behind flush doors, and open niches for the rest.
Painted MDF2 days on site

Panelled oak front door
Raised diamond panels, a five-point lock and an insulated core behind the solid wood.
Solid oak, varnished1 day on site
Survey request
Free visit
Tell us the jobs and, if you have them, the rough sizes of the openings. We come to measure, then send the drawing and the quote together.
By telephone:02 40 12 34 56